72" and 66" Garden State Parkway Crossings
Crossing New Jerseys busiest highway is never easy, especially when the casing pipe is big enough to walk through. However, that did not stop us from completing two massive Jack & Bore’s in 2022 and 2023 as a subcontractor for Carbro Constructors.
With 181’ of 66”, and 240” of 72” Casing to be installed, our Jack and Bore crew was able to successfully install both in a timely manner using our laser guided pilot system to ensure that the pipe was both level and exited exactly where it needed to be.
Both Locations have been restored completely and are in use today.